Cost obstruction in a small network
- Network size
- Seven vertices and nine directed arcs
- Terminal demands
- 15, 10, 15; largest demand 15
- Fractional cost
- 58
- Allowed routing cost
- At least 60 with the non-strict additive load allowance x(a) + 15
The schematic shows the idea. The exact arc data, fractional routing and path enumeration are in the linked Isabelle and Lean sources; this summary is not an executed network certificate.
Fractional cost 58 versus unsplittable cost 60 →